Proposed Traffic System at the intersection of Highway 78 and Highway 124 in Snellville. A two-legged Diverted Left Turn lane was installed on US 78, and a Continuous Flow lane was installed to carry SR 124 traffic onto 78 W without disruption. The project also included the installation of the first signal truss in Georgia. The project was completed in December 2019. 